Ëîãîòèï ÓÏÑÊ Russian English ÎÀÎ «ÓêðÍÈÈïðîåêòñòàëüêîíñòðóêöèÿ èì. Â.Í. Øèìàíîâñêîãî» ÎÀÎ «ÓêðÍÈÈïðîåêòñòàëüêîíñòðóêöèÿ èì. Â.Í. Øèìàíîâñêîãî» www.urdisc.com.ua www.urdisc.com.ua    
Ëîãîòèï ÓÏÑÊ
TO MAIN PAGE<< Organizational structure <<
   
News and advertisement Information for contacts Representatives
Design complex
Make-up of Complexes
High-rise intallations department
Department for integrated design and reconstruction of the manufacturer-plants
Department for bridges and special structures
Department for spatial structures
Sheet and plate construction department
Nuclear power engineering projects department
Department for examination, diagnostics and reconstruction
Department for complex design and civil engineering work technology
Technical Department
Testing laboratory for technical diagnostics
Cost Estimate Group
 
   
Khokhlov V.  

Department manager:
Vladimir Khokhlov
Phone: +38-044-501-87-80
E-mail:
hohlov@urdisc.com.ua

Ronshin G.  

Chief design
engineer:

Gennady Ronshin
Phone: +38-044-503-89-43

   
Nuclear power engineering projects department  
The main trends of the activity

Development of standard programs for technical condition assessment and reassignment of structural service life of the most responsible building metalwork at power units of nuclear power plants.

Operations aimed at technical condition assessment and reassignment of service life of building metalwork at a variety of nuclear power plants in Ukraine and Russian Federation have been performed.
Elaborations of the complex branch
Chernobyl NPP Khmelnitskiy NPP Rostov NPP
Zaporzhie NPP Rovno NPP
The specialists from department in cooperation with experts from other departments of the Institute have taken participation in elaboration of the following designs:
the technical condition assessment program and reassignment of structural service life for NPP. Reactor shaft;
the technical condition assessment program and reassignment of structural service life for NPP. The foundations, walls and floorings at reactor department;
standard program for the technical condition assessment and reassignment of cooling pond service life with all constructions and members, including rack systems;
standard program for the technical condition assessment of general premises and buildings of nuclear power plants, containing systems which are important for safety;
standard program for the technical condition assessment of foundations, insertion pieces and elements for arrangement of equipment for reactor department;
load-carrying structures of the existing the "Shelter" facility have been designed, as well as design analysis has been performed and the project aimed at reinforcing of exhaust vent stack has been carried out at Chernobyl NPP;
technical condition assessment of contact zones of internal metalwork along with thermal cladding of protective shells at reactor department ¹¹ 1-6 of reactor type ÂÂÝÐ 1000, in order to reveal wrong connections and to present recommendations for elimination of some technical defects is carried out;
development of technical condition assessment program and reassignment of service life of general premises and buildings of nuclear power plants containing systems, which are important for safety, such as: foundations, insertion pieces and elements for fixation of equipment at NPP reactor department (power units ¹1 and ¹2) at Rovno NPP is carried out;
development of work schedule for examination and technical conditions assessment of the buildings and structures of power units at Khmelnitsky NPP ¹3 and ¹4 is carried out;
investigution of technical condition of artificial foundation and load-carrying steel structures of engine room framework at power unit ¹2 at Rostov NPP based on investigation and design analysis, development of technical documentation for reinforcing of foundation and metalwork has been carried out.
analysis of stress-and-strain state of metalwork at reactors of unit ¹ 1, 2 at Chernobyl NPP is carried out.

Upward_