Director:
Morozov Vasily
Phone: +38-294-6-25-55,
+38-294-9-35-05,
Mob.Phone: +38-050-411-14-58,
e-mail:
mvs@urdisc.com.ua
Director Assistant:
Andrey Bilyk
Phone: +38-294-6-25-55,
Mob.Phone: +380-67-604-57-83
Chief engineer:
Anatoly Trush
Phone: +38-294-6-25-55,
Mob.Phone: +38-050-411-14-26
Chief Accountant:
Svetlana Gavrilenko
Phone: +38-294-9-35-17,
+38-294-6-25-55
Chief of planning
and economic department:
Mikhail Starostenko
Phone: +38-294-6-25-55,
Mob.Phone: +38-050-312-54-01
RECEPTION ROOM:
Ludmila Zigura
Phone: +38-294-9-35-17.
mvs@urdisc.com.ua
....................................
Post address:
Ukraine, 07462,
Kiev district,
city Brovary,
Lesnaya Str. 4. |
|
|
|
|
|
|
Experimental and Production Base in city Brovary |
|
|
|
|
The main trends in activities |
Experimental investigation of new advanced types of metalwork.
Designing, fabrication and erection of metalwork used in industrial and civil buildings and structures.
Fabrication of multi-purpose metalwork.
Examination, technical condition assessment, test work and elaboration of drawings for reinforcing of the existing metalwork used in buildings and structures.
Quality inspection during all stages of project realization. |
|
Potential capacities and equipment |
|
Fabrication of building metalwork is performed at Production base attached to OJSC "V. Shimanovsky Ukrainian Research and Design Institute of Steel Construction", located in city Brovary.
Capacity of the base is 5000 t of metal structures per year.
Production Base consists of:
industrial premises in the form of building of 5184 sq. m. area and spans 24 m and 30 m, equipped with traveling cranes of 10 and 16 tons load-carrying capacity;
open-air storage of 1200 sq. m. area, provided with gantry crane.
At the base disposal there are the following equipment and machinery:
gas oxygen and plasma pipes cutting machine "TUBOSEC-1500" made by Company "MESSER GREISHEIM";
strip sowing machine STG 440;
plasma installations Dnepr-2, Kiev 4M;
welding tractors À-1896, ÒÑ-17;
welding semi-automatic machines made by Company "FRONIUS";
inclined throat shears, factory mills and other equipment. |
|
An exceptional technology for pipes processing to obtain joints without junction plates is used. Cutting of pipes is performed by means of machine «TUBOSEC-1500», which enables to process pipes of diameters within the range from 80 mm up to 1500 mm.
|
Cutting and welding of metalwork made of pipes
|
|
|
TECHNOLOGY |
|
|
|
|
|
|
Cutting of metalwork made of pipes. Pipes diameter is 80 mm – 1500 mm, thickness of walls is 5 mm – 40 mm
|
|
|
METALWORK PROCESSING |
|
|
1. Frameworks of industrial buildings and structures:
columns and braces;
crane girders and braking structures;
roof and under roof trusses, purlins, braces;
suspended transport tracks;
intermediate floors;
working areas, stairs, railings.
2. Frameworks of civil buildings and structures (supermarkets, logistics centers, trade centers).
3. Transport and pedestrian galleries.
4. Silos and bins (rectangular, conical and circular in configuration).
5. Tanks for petroleum products storage (cylindrical, vertical).
6. Other metalwork.
7. Metalwork of tubular trusses, providing adjoining without junction plates.
|
|
Representative projects |
|
|
|
|
|
|
|
|
Communication tower in city Pereyaslav-Khmelnitsky 45 m high.
Metallic members for attachment of paraboloid aerial of 6,1 m in diameter, installed on OJSC "Kvazar" administrative building in Kiev.
Metalwork used in shop of surface preparation for painting, bathes at degreasing shop attached to OJSC "Polymer-Color", city Brovary.
Metallic members for attachment of receiving and broadcasting systems at Kiev TV-tower for OJSC "Kvant-Efir".
Chimney stack 30 m high in village Bucha in Kiev district.
Metalwork of dome with dimensions 12x12 m and 6 m high for Company "Ukrchastotnadzor" in Kiev.
Platforms for aerials attachments, TL overpasses on tower 110 m high in city Shpola in Cherkassy district.
Chamber for metal processing by explosion intended to be used at Paton Electric Welding Institute.
Reconstruction of building, located at Podol district in Kiev. Helicopter platform metalwork.
Construction of social and cultural facilities at Obolon district in Kiev. Units A, B.
Construction ceramic blocks producing plant. Inner and outer air ducts of driers and furnaces according to order presented by French Company "Ceric", village Ozery of Borodyansky district.
Construction ceramic blocks producing plant. Inner and outer air ducts of driers and furnaces according to order presented by French Company "Ceric", village Ozery of Borodyansky district.
Construction of trade and office center with public-purpose facilities and parking at Pechersk district in Kiev. Trade and office part of this complex.
|
|
The projects created with participation of the Institute >> |
|
TO MAIN PAGE >> |
|