Chief design
engineer:
Gennady Ronshin
Phone: +38-044-503-89-43
|
|
|
|
|
|
|
Nuclear power engineering projects department |
|
|
|
|
The main trends of the activity |
Development of standard programs for technical condition assessment and reassignment of structural service life of the most responsible building metalwork at power units of nuclear power plants.
Operations aimed at technical condition assessment and reassignment of service life of building metalwork at a variety of nuclear power plants in Ukraine and Russian Federation have been performed. |
|
Elaborations of the complex branch |
|
|
|
|
|
The specialists from department in cooperation with experts from other departments of the Institute have taken participation in elaboration of the following designs:
the technical condition assessment program and reassignment of structural service life for NPP. Reactor shaft;
the technical condition assessment program and reassignment of structural service life for NPP. The foundations, walls and floorings at reactor department;
standard program for the technical condition assessment and reassignment of cooling pond service life with all constructions and members, including rack systems;
standard program for the technical condition assessment of general premises and buildings of nuclear power plants, containing systems which are important for safety;
standard program for the technical condition assessment of foundations, insertion pieces and elements for arrangement of equipment for reactor department;
load-carrying structures of the existing the "Shelter" facility have been designed, as well as design analysis has been performed and the project aimed at reinforcing of exhaust vent stack has been carried out at Chernobyl NPP;
technical condition assessment of contact zones of internal metalwork along with thermal cladding of protective shells at reactor department ¹¹ 1-6 of reactor type ÂÂÝÐ 1000, in order to reveal wrong connections and to present recommendations for elimination of some technical defects is carried out;
development of technical condition assessment program and reassignment of service life of general premises and buildings of nuclear power plants containing systems, which are important for safety, such as: foundations, insertion pieces and elements for fixation of equipment at NPP reactor department (power units ¹1 and ¹2) at Rovno NPP is carried out;
development of work schedule for examination and technical conditions assessment of the buildings and structures of power units at Khmelnitsky NPP ¹3 and ¹4 is carried out;
investigution of technical condition of artificial foundation and load-carrying steel structures of engine room framework at power unit ¹2 at Rostov NPP based on investigation and design analysis, development of technical documentation for reinforcing of foundation and metalwork has been carried out.
analysis of stress-and-strain state of metalwork at reactors of unit ¹ 1, 2 at Chernobyl NPP is carried out.
|
|
The projects, in which the Institute took participation >> |
|