Ëîãîòèï ÓÏÑÊ Russian English ÎÀÎ «ÓêðÍÈÈïðîåêòñòàëüêîíñòðóêöèÿ èì. Â.Í. Øèìàíîâñêîãî» ÎÀÎ «ÓêðÍÈÈïðîåêòñòàëüêîíñòðóêöèÿ èì. Â.Í. Øèìàíîâñêîãî» www.urdisc.com.ua www.urdisc.com.ua    
Ëîãîòèï ÓÏÑÊ
TO MAIN PAGE<< Organizational structure <<
   
News and advertisement Information for contacts Representatives
Detached subdivisions complex
Make-up of Complexes
Poltava complex branch
Dnepropetrovslk complex branch
Ìàriupol complex branch
Kharkov complex branch
Lugansk complex branch
Îdessa complex branch
Donbass center of technological safety
Technological safety center attached to National University "Lvivska Polytechnica"
Representative office in Russian Federation (cityMoscow)
Representative office in Republic of Belarus (city Mogilev)
 
   
Pashkov V.  

Director:
Vladislav Pashkov
Phone: +38-048-725-21-01,
Fax: +38-048-722-71-22.
E-mail:
Diana_Pachkova@ukr.net

Pashkova D.  

Director Assistant,
Chief Accountant:

Diana Pashkova
Phone: +38-048-722-71-22.

Demurat G.  

Main specialist
Of the branch:

Gennady Demurat
Phone: +38-048-722-71-22.

......................

Post address:
Ukraine, 65045,
city Odessa,
Nechiporenko lane, 14
   
Îdessa complex branch  
The main trends of the activity

Development of project documentation for construction, rehabilitation and technical re-equipment of projects related with industrial complex, masts, chimneys, transporter galleries, structures of cooling towers and other installations.
Investigation and elaboration of technical documentation aimed at reinforcing or substitution of the structures of buildings and installations in the case of an accident.
Elaboration of projects for organization of construction work for erection of industrial and civil buildings.
Elaboration of projects for work execution related with erection of industrial and civil buildings and installations, chimneys, masts, towers, vertical cylindrical tanks.
Design of industrial buildings and structures.


Elaborations of the complex branch

Work execution plan for erection of tank to be used for oil product storage at Odessa petroleum processing plant.
Work execution plan for substitution of capacitor at "Àzot" Company, city Cherkassy.
Investigation of pedestrian bridge metalwork at Jeanne Laburb slope street, city Odessa.
Work execution plan for disassembly of tower crane "Potain 744E" city Odessa, Sea terminal.
Design of load carrying structures of boiler room with reconstruction of chimney stack Í=30 m, "Åxim nefteproduct" Company.
Work execution plan for erection of roof system made of steel structures for sport complex attached to Odessa plant, located near port, city Yuzhny.
Development of ÊÌD /detailed/ drawings for main boiler building and work execution plan for erection of chimney stack H=40 m. Project in city Mironovka.
Development of detail drawings for supports Í=28 m. intended for carriage units to be used with fire extinguishing systems of whars
¹ 3, ¹ 4, port Yuzhny.
Reconstruction of storage area for general cargo and removal of metallic depots L=50 m, 45 m, 35 m. At the territory of Illichevsk sea and fish port, city Odessa.

Upward_